THE FOLLOWING LIST OF REQUIREMENTS MUST BE COMPLETED FOR ALL GRINDER SYSTEMS AND THIS DOCUMENT MUST BE SIGNED BY THE ELECTRICAL CONTRACTOR BEFORE A FINAL INSPECTION WILL BE PERFORMED BY THE CITY OF HORSESHOE BAY.
FAILURE TO PROPERLY INSTALL A GRINDER SYSTEM TO THESE STANDARDS WILL RESULT IN ADDITIONAL FEES. ALL GRINDER PANEL INSTALLATIONS MUST BE DONE BY A LICENSED ELECTRICIAN OR SOMEONE UNDER THE DIRECT SUPERVISION OR A LICENSED ELECTRICIAN. ALL ELECTRICIANS WORKING WITHIN THE CITY OF HORSESHOE BAY ARE REQUIRED TO REGISTER WITH THE DEVELOPMENT SERVICES DEPARTMENT AND PROVIDE PROOF OF ELECTRICAL LICENSE.
Please ensure all boxes are checked off. Incomplete forms will be returned.
The plumbing portion of the grinder system, line and tank, must pass inspection before a final inspection will be authorized and performed.
IT IS IMPERATIVE THAT POWER BE SUPPLIED TO THE ELECTRICAL DISCONNECT BEFORE REQUESTING A FINAL INSPECTION. IF CITY PERSONNEL ARRIVE TO PERFORM THE FINAL INSPECTION AND POWER IS NOT PRESENT, THE CONTRACTOR WILL BE CHARGED A REINSPECTION FEE BY THE CITY AND FINAL WILL NOT BE GIVEN UNTIL SAID FEES ARE PAID.
This field is not part of the form submission.
* indicates a required field