The following list of requirements must be completed for all grinder systems and this document must be signed by the plumbing contractor before a final inspection will be performed by the City of Horseshoe Bay. Failure to properly install a grinder system to these standards will result in additional fees.
All grinder pump installations must be done by a licensed plumber or someone under the direct supervision or a licensed plumber. All plumbers working within the City of Horseshoe Bay are required to register with the Development Services Department and provide proof of plumbing license.
Line from the sewer tap to basin plus concrete around the basin must be installed before the lines and basin can be covered up. Check off list for both plumber and electrician must be turned into the City’s main office before the final inspection is requested.
BEFORE A FINAL INSPECTION IS CALLED FOR BY THE CONTRACTOR, IT IS IMPERATIVE THAT POWER BE SUPPLIED TO THE ELECTRICAL DISSCONNECT. IF CITY PERSONNEL ARRIVE TO DO A FINAL INSPECTION AND POWER HAS NOT BEEN SUPPLIED, THE CONTRACTOR WILL BE CHARGED A REINSPECTION FEE BY THE CITY AND A FINAL WILL NOT BE DONE UNTIL ALL SAID FEES HAVE BEEN PAID.
ONCE THE ABOVE GUIDELINES HAVE BEEN MET AND CHECKED OFF BY THE PLUMBING CONTRACTOR, THIS FORM MUST BE SIGNED AND RETURNED TO THE CITY OFFICES.
By submitting this form, you are confirming that all check box items have been completed.