Horseshoe Bay Logo
Search

News Flash

Summit Rock Clubhouse Blasting Schedule

Community News Posted on July 25, 2023

Austin Powder will be blasting at the Summit Rock Club House location throughout August. Flagman are scheduled during blasts on Summit Blvd. and in constant radio contact with blasting company. During blasting, Summit Blvd. will be closed for a maximum of 15 minutes.

Maximum Road Closure Time 15 Minutes. 

Upcoming Dates:
TimeRoad Closure Time
Mon., July 31 Between 1-3 PM 
(Maximum Road Closure of 15 Minutes)
Tues., August 1
Between 10 AM-12 PM
(Maximum Road Closure of 15 Minutes)
Mon., August 7
Between 1-3 PM 
(Maximum Road Closure of 15 Minutes)
Tues., August 8
Between 10 AM-12 PM
(Maximum Road Closure of 15 Minutes)
Mon., August 14
Between 1-3 PM 
(Maximum Road Closure of 15 Minutes)
Tues., August 15
Between 10 AM-12 PM
(Maximum Road Closure of 15 Minutes)
Mon., August 21
Between 1-3 PM 
(Maximum Road Closure of 15 Minutes)
Tues., August 22
Between 10 AM-12 PM
(Maximum Road Closure of 15 Minutes)
Mon., August 28
Between 1-3 PM 
(Maximum Road Closure of 15 Minutes)

 

Printable PDF Schedule


Powered by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow